The Field Setup specifies that 8 Rain pieces are placed in the Cloud, and one Rain is loaded in the SlingShot in Base.

RAIN CLOUD AND RAIN: Secure with cloud part facing east. Move and hold yellow bar north while evenly spreading 8 Rain into the top. Perfectly even spread is not expected.

SLINGSHOT (Water Purifier): Install a Rain and the Dirty Water into the Slingshot, and close its black bar to keep the yellow plunger up. Waters must be flat-side down. Rain or Dirty Water can be installed in either side randomly.

Steve Scherr
Virginia-DC FLL Referee Advisor

On Mon, Oct 16, 2017 at 3:09 PM, Fly Minds <[log in to unmask]> wrote:
1st question: I didn’t notice in the challenge guide whether or not any of the rain (clean and/or dirty) is left in the base area or if it all goes in the cloud.

This question is important for the team to complete the sling shot mission

Thank you

Bright Minds (rookie team)
#25137
--
Yasmeen Neal
Director, Fly Minds
www.facebook.com/flyminds2016


To UNSUBSCRIBE or CHANGE your settings, please visit https://listserv.jmu.edu/archives/vadcfll-l.html and select "Join or leave the list".
VADCFLL administrative announcements are sent via VADCFLL-ANNOUNCEMENTS-L. Visit https://listserv.jmu.edu/archives/vadcfll-announcements-l.html to subscribe.